文章
  • 文章
搜索
详细内容

Railway Construction

We supply to Metro construction and railway construction for CRCC.

We provide comprehensive solution for continuous power generation on construction. We designing and installing power generation solution to our clients.

Our engines are designed to for harshest weather condition, while maintain highly efficient and reliable to work 24/7 at site. Our engines are capable to operate continuously for 7000 hours per year. With auto remote controller function, gen-set real time operation parameters and state will be monitored, and machinery will give immediate alarm to monitor equipment when faulty occurred.

 

1.Working altitude suitable for 5000 meter or below

2.Working temperature : >-40℃ and < 50℃, We installed preheater for engine.

3. Increasing water filters to make fuel cleaner

4. New high efficiency turbocharger

5. Long time fuel filter and Oil filter, maintenance every 1500hours



产品中心

产品中心

联系电话:400-000-0000

公司邮箱:12345678@126.com

公司传真:12345678910

公司地址:北京市海淀区理想大厦xxx室

BLOGROLL:

Lambert Engines Company Limited @2019.
All Rights Reserved. 

seo seo